Power & substations
Confirm connected load (kVA/MVA), incoming voltage, utility approval, nearest serving substation, redundancy and energisation lead time. A nearby PMU does not confirm spare capacity.
Add to your requirement ↗Build a technical brief for a Malaysian factory, warehouse or industrial land parcel. Start with the operation’s requirements, then verify the building, utility allocation and logistics route that will serve it.
The right site supports the way you operate. Look beyond the building to power, supply networks and the connections around it.
Explore the infrastructure guide ↗Published power provision, gas infrastructure and the questions to ask about capacity, voltage and connection.
Ports, airports and highway corridors. Understand each reference point before planning the actual road journey.
Floor loading, fibre connectivity and expansion requirements. Compare what is published and verify what matters.
Confirm connected load (kVA/MVA), incoming voltage, utility approval, nearest serving substation, redundancy and energisation lead time. A nearby PMU does not confirm spare capacity.
Add to your requirement ↗Request certified slab loading (kN/m²), point loads, clear height, floor flatness, dock levels, crane provision and a drawing for the actual building.
Add to your requirement ↗Confirm pipeline availability at the boundary, gas pressure, contracted capacity, connection cost, water demand and process effluent treatment.
Add to your requirement ↗Check the service provider, actual fibre entry route, physically diverse links and service-level commitments for the selected plot.
Add to your requirement ↗Use reference-radius screening first, then verify truck-approved road routes, tolls, bridge restrictions, port gates and journey times.
Add to your requirement ↗Check permitted use, EIA and other approvals where applicable, worker accommodation arrangements, expansion land and occupancy milestones.
Add to your requirement ↗No. A substation or transmission line is a network reference. Confirm the selected property’s serving connection, approved voltage, allocated load, spare capacity, utility conditions and energisation programme.
A structural floor-loading rating normally applies to a specific building and slab design. Obtain the selected building’s certified loading schedule, point-load limits and drawings for the intended machinery or storage system.
A straight-line radius is useful for early screening. A brochure distance may use an unspecified route. Verify a truck-suitable road journey between the intended site entrance and port, airport or interchange before using it for operational planning.
Leasing, industrial land acquisition and built-to-suit requirements.