How to read the directory
Profiles describe parks and industrial ecosystems. They do not confirm vacant units, industrial land availability or a developer appointment. This directory is operated by the corporate property desk of One WSM Property Sdn Bhd.
Infrastructure statements
Published provision is recorded separately from unit allocation. A statement that a park has power, gas or fibre does not confirm spare capacity, service voltage, a connection at a particular lot or route redundancy. Floor loading is building-specific.
Location and distance
Map pins identify published reference locations, including park galleries, business centres or an approximate tenant-campus reference. They are not parcel boundaries. Radius search uses PostGIS straight-line geography and excludes approximate and unverified references. Driving-route links open Google Maps for a current journey; no road-distance result is imported automatically.
Developer-published distances retain their original context and an unspecified route basis. We do not describe them as measured Google road distances. Verified highway-interchange, substation and fibre-route distances will be added as source records become available.
Profile sources
Eco Business Park V
i-Park @ Senai Airport City
Port Klang Free Zone
- PKFZ official overview ↗
- PKFZ corporate space application / electrical requirements ↗
- PKFZ prepared industrial land ↗
- Westports official context ↗
- Official MyGeoName Selangor gazetteer ↗
Batu Kawan Industrial Park
- PDC official January 2026 park plan ↗
- InvestPenang park background ↗
- ViTrox official park address and map ↗
- Official MyGeoName Penang gazetteer ↗
Kulim Hi-Tech Park
- KHTP official master plan and infrastructure ↗
- KHTP official overview ↗
- NUR Power service coverage ↗
- KTPC official park history and industrial-phase milestones ↗
Sendayan TechValley
- Sendayan TechValley developer overview ↗
- Developer infrastructure and gas pipeline ↗
- Developer power and water information ↗
- Official MyGeoName Negeri Sembilan gazetteer ↗
BBR Business Park
Chuping Valley Industrial Area
- NCIA official CVIA overview, development scope and utility-readiness summary ↗
- MIDA / NCER July 2026 industrial operations and border-logistics update ↗
- MOF August 2026 visit to Jabil’s CVIA operating site ↗
- NCIA official CVIA brochure (2021 edition; historical planning reference) ↗
- NCIA official investment-brochure catalogue ↗
Compass @ Kota Seri Langat
- Official Compass project overview ↗
- AREA developer portfolio / project scale ↗
- AREA announcement / developer joint venture identity ↗
- Official master plan / published utility provision ↗
- Official site directions and park-reference coordinates ↗
- Official connectivity and published distances ↗
- Official 2026 site progress ↗
Costa Lagenda Industrial Park
- Benalec official Costa Lagenda project page ↗
- Benalec official land portfolio —144-acre Pulau Indah site ↗
- Selangor government industrial-area list ↗
- Invest Selangor May 2026 investment-promotion booklet ↗
District 6 @ SiLC
- AME Development project profile and completion status ↗
- AME Elite corroborating development size and Q3 2015 completion ↗
- AME Construction published project coordinate ↗
Eco Business Park 7
- Official Eco Business Park 7 project page, July 2026 master plan and June 2026 site progress ↗
- EcoWorld official November 2025 launch / developer partnership, scope and tenure ↗
- SD Guthrie official September 2026 conditional data-centre land transaction ↗
Elmina Business Park
- Official Elmina Business Park overview and master plan ↗
- Official 2026 Masterpiece Plus Collection: stage, access and unit specifications ↗
Frontier Industrial Park
- WB Land / Frontier Park identity, established business community and managed campus ↗
- WB Land / historic January 2015 broadband agreement, land scale and tenure (re-published 2026) ↗
- WB Land / official project FAQ ↗
Gambang Halal Park
- ECERDC official industrial-park directory ↗
- ECERDC official project profile ↗
- ECERDC MAHA 2024 industrial-park poster: project utility provision and scoped lot information ↗
- ECERDC published GHP industrial lot and utility layout ↗
- ECERDC completed strategic-project list ↗
- ECERDC current GHP investment flyer ↗
Gerbang Nusajaya Industrial Park — AME–UEM JV
German Technology Park, Melaka
- Official German Technology Park developer profile and layout ↗
- Official factory specifications ↗
- Official industrial-land and fibre/security provision ↗
- Official September2026 site-progress record ↗
- MCORP: Riverwell/Teladan partnership and Ayer Panas location ↗
- Invest Melaka current two-phase area description ↗
- Teladan and MCORP joint announcement dated22March2024 ↗
Hulu Kelang Free Industrial Zone
- Royal Malaysian Customs: Ulu Klang FIZ classification and MPAJ zone authority (list dated 3 August 2023) ↗
- Royal Malaysian Customs: Hulu Kelang FIZ branch location ↗
- MPAJ July 2025 Hulu Kelang FIZ customs-post upgrade tender ↗
- Texas Instruments February 2025 certification site schedule: Ampang Ulu Kelang manufacturing location ↗
IOI Industrial Park @ Banting
- Official IOI Banting project overview and FAQ ↗
- Official December2025 launch and detached-factory specification ↗
- Official2026 data-centre land transaction update ↗
IOI Industrial Park @ Iskandar Malaysia
- Official IOI Iskandar Malaysia project and current industrial-land scope ↗
- Official IOI industrial portfolio and2026 development update ↗
Iskandar Halal Park
- UMLand official Iskandar Halal Park portfolio and former Johor Halal Park identity ↗
- Official IHP overview: freehold, ready-built marketing and road connections ↗
- Official Phase 1 factory-type overview ↗
- UMLand brochure hosted in July 2021: property types and historical indicative distances ↗
KIIP 2 @ Jenjarom
- Official project / land area, tenure, plot range and project schedule ↗
- Official KLANGGROUP industrial portfolio / project status ↗
KIIP @ Jenjarom
- Official project / land area, tenure, plot range and project schedule ↗
- Official KLANGGROUP industrial portfolio / project status ↗
KIIP @ Kapar
- Official project / land area, tenure, plot range and project schedule ↗
- Official KLANGGROUP industrial portfolio / project status ↗
KIIP @ Kapar 2
- Official project / land area, tenure, plot range and project schedule ↗
- Official KLANGGROUP industrial portfolio / project status ↗
KLK TechPark
- Official KLK TechPark master development, tenure, location and published distances ↗
- KLK Land official September 2025 launch and phased-development programme ↗
Kedah Rubber City
- NCIA official KRC overview, area, clusters and park-level utilities ↗
- NCIA 2026 Integrated Business Centre procurement, tender NCIA/2026/011/0012 ↗
- KEDA February 2026 KRC development and tenant construction update ↗
- NCER Strategic Development Plan: Ladang Bukit Ketapang location ↗
- NCIA presentation hosted by MIDA: implementing agency and state support ↗
Kerteh Biopolymer Park
- ECERDC official industrial-park directory ↗
- ECERDC official Kerteh Biopolymer Park overview ↗
- ECERDC June 2025 KBP flyer: phases, land scope, utilities, tenure and published distances ↗
- ECERDC 27 October 2025 SME Complex Phase 1B construction milestone ↗
Kuantan Fish Processing Park
- ECERDC official industrial-park directory ↗
- ECERDC official project profile ↗
- LKIM official ECERDC fisheries-processing collaboration ↗
- LKIM 2025 KIFPP infrastructure-upgrade quotation ↗
- PT Resources official facility address within KIFPP; not a statement of whole-park ownership ↗
- ECERDC completed strategic-project list ↗
MVV TechValley
- Official MVV TechValley scale, natural gas, 5G, collections and phase updates ↗
- Official industrial land scope and utility connection qualifications ↗
- Matrix Concepts project coverage including fibre-optic connectivity ↗
- MIDA official MVV TechValley project overview ↗
Malaysia–China Kuantan Industrial Park
- ECERDC official MCKIP virtual tour ↗
- ECERDC official MCKIP 1 and 2 overview and project image ↗
- MCKIP official master-development phases and industry orientation ↗
- ECERDC 28 October 2026 phase-specific infrastructure and interchange milestone ↗
- ECERDC official MCKIP 3 project overview ↗
- ECERDC historical master-developer identity and consortium structure ↗
Malaysia–China Kuantan Industrial Park 1 & 2
- ECERDC official industrial-park directory ↗
- ECERDC official MCKIP 1 and 2 phase-group overview ↗
- MCKIP official master-development phase overview ↗
- ECERDC historical master-developer identity ↗
Malaysia–China Kuantan Industrial Park 3
- ECERDC official industrial-park directory ↗
- ECERDC official MCKIP 3 profile ↗
- ECERDC June 2025 MCKIP 3 flyer: utility provision and published connectivity ↗
- ECERDC earlier MCKIP 3 flyer: industrial offering scope ↗
- ECERDC 28 October 2026 Phase 1 Package 1 and port-interchange milestone ↗
NCT Smart Industrial Park
- Official September 2026 Phase 1 handover, KM2 launch and expanded master plan ↗
- NCT Alliance official project profile and map links ↗
- Official developer-linked microsite / utility provision ↗
- Official microsite / network accessibility ↗
Northern TechValley @ BKE
- AME official project overview ↗
- Official launch and utility provision ↗
- Official 8 August 2025 flyover construction update ↗
- Official connectivity page ↗
- AME 30 October 2026 current development portfolio ↗
Pahang Technology Park
- ECERDC official industrial-park directory ↗
- ECERDC official project profile ↗
- ECERDC PTP industrial utilities and Cybercentre facilities flyer ↗
- ECERDC published PTP industrial, mixed-development and utility layout ↗
- ECERDC completed strategic-project list ↗
- ECERDC current PTP investment flyer ↗
Pasir Mas Halal Park
- ECERDC official industrial park index and virtual-tour directory ↗
- ECERDC current PMHP overview, HALMAS status and infrastructure ↗
- ECERDC strategic projects: PMHP listed as completed ↗
- ECERDC 2017 record of ECERDC and PKINK joint development ↗
- ECERDC MAHA 2024 park poster: historical scope and infrastructure ↗
Pekan Automotive Park
- ECERDC official industrial-park directory ↗
- ECERDC official project profile ↗
- ECERDC published PAP land-use and utility layout ↗
- ECERDC current PAP investment brochure ↗
- ECERDC completed strategic-project list ↗
- ECERDC historical 2014 automotive-ecosystem and investment-land scope ↗
Penang Science Park
- PDC official Penang Science Park plan, January 2026 ↗
- PDC regional plan distinguishing PSP, PSP North and PSP South ↗
- InvestPenang official industrial park network ↗
Perdana Industrial Park @ Northport
- Selangor State Assembly 2025 industrial-area list: Perdana Industrial Park, Pelabuhan Klang (row 27) ↗
- PolymerLink official corporate information: principal business location within Perdana Industrial Park ↗
- Media Prima July 2021 Bursa filing: nearby Perdana detached-factory development (page 2) ↗
Pulau Indah Industrial Park
- Central Spectrum corporate portfolio and phase relationships ↗
- Official PIIP 3B connectivity leaflet ↗
- Selangor government industrial-area list ↗
- Project planning consultant phase scopes ↗
- FMM industrial-park infrastructure directory (historical) ↗
- Official MyGeoName Selangor gazetteer ↗
- CSSB-issued October 2025 PIIP transaction announcement ↗
SBB Industrial Park
- First Selangor Plan mid-term review — SBB master plan ↗
- CSSB corporate portfolio — Phase 1A handover ↗
- Selangor government July 2024 phase status ↗
- SBB planning consultant confirms Selangor Bio Bay name ↗
- SBB civil/infrastructure engineering scope ↗
- Selangor government industrial-area list ↗
- Government-linked report locating digital/green technology proposal at SBB ↗
SME City
- AME Development project profile, roads and completion status ↗
- AME Elite group portfolio profile ↗
- AME Construction published project coordinate ↗
SPD Tech Valley
- Official SPD project and utility overview ↗
- MIDA / 2026 park scale, tenure and regional connectivity ↗
- Developer identity / Seri Pajam Development Group ↗
- Official 2026 project news ↗
- Dunham-Bush / September 2026 land-acquisition statement ↗
Sama Jaya Free Industrial Zone
- Royal Malaysian Customs Free Industrial Zone list and Sama Jaya authority (underlying list dated 3 August 2023) ↗
- Sarawak ministry industrial facilities and Sama Jaya high-tech industry overview ↗
- UKAS September 2026 Taiyo Yuden tenant expansion proposal at Sama Jaya ↗
- PNB Commercial Kawasan MIEL Sama Jaya property subset and photograph ↗
- Current MINTRED industrial-estate and Sama Jaya listing ↗
Samalaju Industrial Park
- RECODA official SCORE and Samalaju Industrial Park overview ↗
- MIDA May 2025 Samalaju operations and infrastructure project update ↗
- Sarawak Energy January 2023 commissioning of Murum–Samalaju B 275kV network ↗
- Sarawak Water official Samalaju treatment-plant design capacity and coverage ↗
Selangor Halal Hub, Pulau Indah
- CSSB corporate portfolio confirms PIIP Phase 2 relationship ↗
- Selangor government2023 halal industrial-site answer ↗
- Selangor government industrial-area list — SHH separately named ↗
- Developer PIIP/SHH leaflet (2016 historical designation) ↗
- Invest Selangor2020 guidebook — designated halal parks ↗
- Project master-planning consultant ↗
Semanja Business Park
- Official Semanja Business Park project page and infrastructure progress ↗
- Developer sales kit / project facts, tenure and factory-type specifications ↗
- Official developer project directory / distinct Puncak Alam and Banting projects ↗
Semanja Langat Business Park
- Official developer project directory / Semanja Langat overview ↗
- Official Semanja Langat brochure / tenure, infrastructure, industrial zoning and published distances ↗
Senai Airport City
- MMC official master-developer profile and development scope ↗
- Official Senai Airport City infrastructure and master plan ↗
- MMC phased-development and free-zone overview ↗
Serenia Industrial Park
Silicon Island, Penang
- Official island / Green Tech Park scope, tenure and development timeline ↗
- Official October 2026 reclamation milestone ↗
- Official developer entity and PIC PD / SRS PD ownership ↗
- Gamuda official reclamation construction project ↗
Sungei Way Free Industrial Zone
- Royal Malaysian Customs: FIZ classification and MBPJ zone authority (list dated 3 August 2023) ↗
- Royal Malaysian Customs: Sungai Way FIZ branch location ↗
- NXP official Malaysia location and assembly-and-test operations ↗
- NXP August 2026 tenant factory expansion and Q1 2028 production target ↗
THAB PTP Logistics Hub
- Boustead official THAB PTP project profile ↗
- Boustead portfolio labels two-level ramp-up logistics facility ↗
- Boustead FY2018 annual report / THAB completed logistics hub and AME partnership ↗
- Boustead FY2021 report / THAB partners and investments ↗
The Jacaranda
- AME Development commercial project profile and completion date ↗
- Official commercial project brochure ↗
The Magnet — Selangor Global HIS Village
- CSSB-issued 19 September 2025 partnership and factory/F&B programme ↗
- Project architect confirms PIIP Phase 3C, factory/commercial use and August 2025 completion ↗
Tok Bali Industrial Park
- ECERDC official industrial park index and virtual-tour directory ↗
- ECERDC official TBIP project overview and separate TBIFP relationship ↗
- ECERDC development plan: phases and planned utility design ↗
- ECERDC 28 October 2026 construction-progress report ↗
Tok Bali Integrated Fisheries Park
- ECERDC official industrial park index and virtual-tour directory ↗
- ECERDC official TBIFP page and distinction from TBIP ↗
- ECERDC September 2023 completion of TBIFP Phase 1B Package 3 ↗
- ECERDC strategic projects: TBIFP listed separately as completed ↗
- ECERDC 2017 wider fisheries-park scope ↗
- ECERDC 2024 investment poster: Phase 1A/1B plots and utility list ↗
UMW High Value Manufacturing Park
- UMW Development official current park overview and 861-acre scope ↗
- Official park infrastructure, utilities and industrial road descriptions ↗
- Developer presentation dated 13 June 2024, hosted by MIDA ↗
- KKR May 2026 access-road handover project record ↗
- Sime official March 2024 completion of UMW acquisition ↗
Vision Business Park
- Official Vision Business Park overview, master plan and Pioneer Collection ↗
- Sime Darby Property official 18 April 2025 launch and project scope ↗
i-Park @ Coalfields
- Official 22 July 2026 Coalfields preview ↗
- AME Ijok Selangor overview (same project) ↗
- AME 30 October 2026 current development portfolio ↗
i-Park @ Indahpura
- AME Development project profile and infrastructure ↗
- AME Construction published coordinate ↗
- Developer brochure / historical published distances ↗
i-Park @ SiLC
- AME Development project profile and completion status ↗
- AME Construction project and published coordinate ↗
- Official developer brochure ↗
i-TechHub
i-TechValley at SiLC
- AME official project overview ↗
- Official project concept and infrastructure ↗
- Official Type A specification ↗
- Official Type B specification ↗
- Official connectivity and project map link ↗
- AME 30 October 2026 current development portfolio ↗
iBP @ Nusajaya
- Boustead confirms THAB partnership with AME and iBP development ↗
- Boustead FY2018 annual report / completed JV developments ↗
- THAB official developer-partner profile ↗
- THAB published building design loads and electrical specification ↗
- THAB official contact and published GPS point ↗
- AMEConstruction project record ↗
techpark@enstek
- TH Properties official project scale and industrial park overview ↗
- Official current TechPark 3 positioning and infrastructure statements ↗
- Official phase history, scope and developer contact entity ↗
Regional map geography
Regional outlines use public-domain Natural Earth geography. This is an overview map, not street routing or a survey. Natural Earth source and terms ↗.
Photography
Project photographs, developer renderings and master plans carry source links, media-type labels and credits on their profiles. Use in this directory does not imply sponsorship, partnership or an exclusive sales appointment. Location graphics are labelled and do not depict real buildings.
Corrections
Developers, operators and utility providers can submit corrections and source documents through our corporate desk. Verification dates and source references help keep the directory useful.