About Chuping Valley Industrial Area
Chuping Valley Industrial Area is at Lembah Chuping, near Padang Besar in Perlis, Malaysia. The phased manufacturing development serves cross-border supply chains, with Perlis Inland Port as a separate regional logistics reference.
Published industry focus: Green manufacturing and technology · Halal industries · Renewable energy · Electric vehicles and related manufacturing
NCIA describes a 2,482-acre overall development. This is not a net saleable area, current vacancy figure or a surveyed boundary for an individual phase or plot.
Also known as: CVIA · Kawasan Perindustrian Lembah Chuping · KPLC · Lembah Chuping Industrial Area · Chuping Valley Industrial Park
Infrastructure & operational fit.
Project-level information provides a starting point. Confirm the actual plot, building and service allocation before making a commitment.
| Power provision | Park-level electricity-readiness figure published by NCIA: 76.81 MVA. Individual incoming voltage, connection and available load remain unverified.Source statement; actual unit and service confirmation required. |
|---|---|
| Floor loading | No universal industrial-area floor-loading specification verified; obtain the structural schedule for the selected building.Source statement; actual unit and service confirmation required. |
| Gas infrastructure | NCIA lists 4 million MMBtu per year in its park-level gas-readiness summary; plot connection, commissioning and pressure remain unverified.Source statement; actual unit and service confirmation required. |
| Fibre & telecoms | The 2025 brochure states fibre-optic and 5G provision, while NCIA lists 16 telecommunication ports. Carrier availability, physical routes, throughput, path diversity and active service for a selected parcel require confirmation.Source statement; actual unit and service confirmation required. |
| Water | NCIA publishes 19.14 million litres per day as a park-level industrial-water figure; available and individually allocated capacity require confirmation.Source statement; actual unit and service confirmation required. |
| Highway corridors | Jalan Ulu Pauh–Padang Besar · North–South Expressway regional connection |
Additional infrastructure records.
| Power | Park-level electricity-readiness figure published by NCIA: 76.81 MVA. Individual incoming voltage, connection and available load remain unverified.Published park-level utility summaryPublished capacity: 76.81 MVASource stated · 1 November 2026Published park-level readiness figure, not proof of spare capacity, an allocated individual supply or an activated connection. Confirm the intended phase and parcel.Source ↗ |
|---|---|
| Floor loading | No universal industrial-area floor-loading specification verified; obtain the structural schedule for the selected building.Unknown |
| Gas | NCIA lists 4 million MMBtu per year in its park-level gas-readiness summary; plot connection, commissioning and pressure remain unverified.Published park-level utility summarySource stated · 1 November 2026Published park-level readiness figure, not proof of spare capacity, an allocated individual supply or an activated connection. Confirm the intended phase and parcel.Source ↗ |
| Fibre | The 2025 brochure states fibre-optic and 5G provision, while NCIA lists 16 telecommunication ports. Carrier availability, physical routes, throughput, path diversity and active service for a selected parcel require confirmation.Source stated · 1 November 2026NCIA publishes the port count; the uploaded 2025 CVIA brochure, page 4, states fibre-optic and 5G provision. These statements do not establish a plot-specific activated service, routes or service-level agreement.Source ↗ |
| Water | NCIA publishes 19.14 million litres per day (19,140 m³/day) as the industrial area’s water-readiness figure.Published park-level utility summaryPublished water capacity: 19140 m³/daySource stated · 1 November 2026Published park-level readiness figure, not proof of spare capacity, an allocated individual supply or an activated connection. Confirm the intended phase and parcel.Source ↗ |
Connections that matter.
Project media & documents.
Source documents.
- NCIA official CVIA overview, development scope and utility-readiness summary ↗ · Reviewed 1 November 2026
- MIDA / NCER July 2026 industrial operations and border-logistics update ↗ · Reviewed 1 November 2026
- MOF August 2026 visit to Jabil’s CVIA operating site ↗ · Reviewed 1 November 2026
- NCIA official CVIA brochure (2021 edition; historical planning reference) ↗ · Reviewed 1 November 2026
- NCIA official investment-brochure catalogue ↗ · Reviewed 1 November 2026