About Eco Business Park I
Eco Business Park I is an EcoWorld industrial development in Tebrau, Johor Bahru, Johor, Malaysia. The published 612-acre gross park includes cluster and semi-detached factory phases and supporting business formats.
Published gross park/development scope, also stated on the live official location page. It is not current available land or a single phase's net industrial area.
Also known as: Eco Business Park 1 · EBP I · EBP1 · Eco Business Park Tebrau
Infrastructure & operational fit.
Project-level information provides a starting point. Confirm the actual plot, building and service allocation before making a commitment.
| Power provision | Park incoming voltage and allocated plot capacity not published in the reviewed park-specific official sources; confirm the selected unit or plotSource statement; actual unit and service confirmation required. |
|---|---|
| Floor loading | Building-specific; no park-wide or current selected-unit floor-load rating verifiedSource statement; actual unit and service confirmation required. |
| Gas infrastructure | Gas pipeline provision and individual connection availability not verified in reviewed official sourcesSource statement; actual unit and service confirmation required. |
| Fibre & telecoms | High-speed broadband is advertised by the developer. Fibre medium, provider, physical routes and redundancy are not specified.Source statement; actual unit and service confirmation required. |
| Highway corridors | North–South Expressway · Eastern Dispersal Link (EDL) · Pasir Gudang Highway · Johor–Singapore Second Link Expressway · Senai–Desaru Expressway |
Additional infrastructure records.
| Power | Park incoming voltage and allocated plot capacity not published in the reviewed park-specific official sources; confirm the selected unit or plotUnknown · 1 November 2026 |
|---|---|
| Floor loading | Building-specific; no park-wide or current selected-unit floor-load rating verifiedUnknown · 1 November 2026 |
| Gas | Gas pipeline provision and individual connection availability not verified in reviewed official sourcesUnknown · 1 November 2026 |
| Fibre | High-speed broadband is advertised by the developer. Fibre medium, provider, physical routes and redundancy are not specified.Unknown · 1 November 2026Developer advertises high-speed broadband, but does not establish physical fibre medium, carrier, routes or redundancy. Fibre availability remains unknown.Source ↗ |
Connections that matter.
Project media & documents.
Source documents.
- Official Eco Business Park I project overview and product phases ↗ · Reviewed 1 November 2026Current project identity and built/product imagery; do not use historic launch counts as live stock.
- Official EBP I location, gross acreage, roads and published distances ↗ · Reviewed 1 November 2026Official HTML retrieved successfully although web-reader fetch failed. Marketing distances have no stated road-route basis.
- Official EBP I features and broadband description ↗ · Reviewed 1 November 2026Broadband is stated; no claim of verified fibre routes, carrier diversity or incoming power capacity.
- EcoWorld official March 2026 results / EBP I land sale completed ↗ · Reviewed 1 November 2026A completed land transaction does not establish completion or operating status of the buyer's data centre.
- EcoWorld official historical portfolio / whole-park area and tenure ↗ · Reviewed 1 November 2026Historical portfolio corroborates 612-acre gross freehold scope; acreage is not remaining stock.
Explore industrial parks in Johor
Browse the Johor park directory ↗
- District 6 @ SiLC · SiLC, Iskandar Puteri
- Eco Business Park 8 · Mukim Kulai, Kulai–Sedenak, JS-SEZ Flagship F
- Eco Business Park 9 · IBTEC South, Mukim Bukit Batu, Kulai
