Elmina Business Park

A freehold industrial township with factory products and industrial land. Its Stage 2 programme includes the Masterpiece Plus detached-factory collection launched in 2026.

SelangorSungai BulohIndustrial parkIndustrial township
Developer aerial master plan rendering of Elmina Business Park Stage 2 and surrounding precincts in Selangor

Elmina Business Park · Indicative developer aerial master plan, not completed facilities or a surveyed boundary · Image credit: Sime Darby Property · Image source ↗

About Elmina Business Park

Elmina Business Park is in Sungai Buloh, Selangor, Malaysia. The northern Klang Valley industrial township includes factory products, industrial land and a phased Stage 2 programme.

Developer markets Stage 1 as fully sold and Masterpiece Plus as a 2026 launch. The proposed GCE interchange is targeted for 2027; treat it as future access pending completion.

Developer-published overall park scale; the Stage 2 scheme is a precinct within this wider park.

Also known as: Elmina Industrial Park · EBP

Infrastructure & operational fit.

Project-level information provides a starting point. Confirm the actual plot, building and service allocation before making a commitment.

Power provisionMasterpiece Plus Collection: 400 A published per unit; incoming voltage and allocated capacity require confirmationSource statement; actual unit and service confirmation required.
Floor loadingMasterpiece Plus production area: 30 kN/m²; optional upgrade up to 50 kN/m² at additional cost. Other products differ.Source statement; actual unit and service confirmation required.
Gas infrastructureGas connection and pipeline availability not verifiedSource statement; actual unit and service confirmation required.
Fibre & telecomsStage 2 advertises 5 G broadband readiness; physical fibre routes and carrier diversity not verifiedSource statement; actual unit and service confirmation required.
Highway corridorsGCE · LATAR · NSE · NKVE · DASH
Published park infrastructure does not establish an individual property’s allocated capacity, connection rights, floor rating or current availability. Basic directory profile. Current availability, terms and commissioned services require confirmation.

Additional infrastructure records.

PowerMasterpiece Plus Collection: 400 A published per unit; incoming voltage and allocated capacity require confirmationStage 2 · Masterpiece Plus CollectionPublished current: 400 ASource stated · 31 October 2026Published specification or provision applies only to its stated phase, product and scope; individual capacity, commissioning and availability require confirmation.Source ↗
Floor loadingMasterpiece Plus production area: 30 kN/m²; optional upgrade up to 50 kN/m² at additional cost. Other products differ.Stage 2 · Masterpiece Plus CollectionPublished floor loading: 30 kN/m²Source stated · 31 October 2026Published specification or provision applies only to its stated phase, product and scope; individual capacity, commissioning and availability require confirmation.Source ↗
GasGas connection and pipeline availability not verifiedUnknown · 31 October 2026Published specification or provision applies only to its stated phase, product and scope; individual capacity, commissioning and availability require confirmation.
FibreStage 2 advertises 5 G broadband readiness; physical fibre routes and carrier diversity not verifiedUnknown · 31 October 2026Published specification or provision applies only to its stated phase, product and scope; individual capacity, commissioning and availability require confirmation.

Connections that matter.

Subang Airport19 km · Developer-published distance; route basis unspecifiedDeveloper-published distances; route, gate and measurement method unspecified. Not verified road measurements.Measurement source ↗
Open driving route ↗
Port Klang40 km · Developer-published distance; route basis unspecifiedDeveloper-published distances; route, gate and measurement method unspecified. Not verified road measurements.Measurement source ↗
Open driving route ↗
KLIA / KLIA260 km · Developer-published distance; route basis unspecifiedDeveloper-published distances; route, gate and measurement method unspecified. Not verified road measurements.Measurement source ↗
Open driving route ↗

Project media & documents.

Source documents.

Explore industrial parks in Selangor

Browse the Selangor park directory ↗

Your next industrial address

Let’s put your operation on the map.

Leasing, industrial land acquisition and built-to-suit requirements.

Talk to our corporate desk ↗
0 parks in your shortlistCompare parks ↗