Gerbang Nusajaya Industrial Park — AME–UEM JV

UEM Sunrise and AME announced a 50:50 joint venture on 30 October 2026 for a proposed 402-acre industrial park at Gerbang Nusajaya. The RM4.0 billion development is planned in three phases, with the first expected to commence by the end of 2027.

JohorIskandar PuteriIndustrial parkAnnounced industrial project
UEM Sunrise and AME Elite representatives sign the Gerbang Nusajaya industrial park joint venture agreement

UEM Sunrise and AME Elite signing the joint venture agreement for the proposed 402-acre Gerbang Nusajaya industrial park, Iskandar Puteri, on 30 October 2026. This is the project announcement event; phase one is planned to commence by the end of 2027. · Image credit: UEM Sunrise Berhad · Image source ↗

About Gerbang Nusajaya Industrial Park — AME–UEM JV

Gerbang Nusajaya Industrial Park — AME–UEM JV is in Gerbang Nusajaya, Iskandar Puteri, Johor, Malaysia. The AME–UEM joint venture is an announced industrial development at Gerbang Nusajaya; proposed phases are distinguished from completed infrastructure.

Descriptive directory title. A separate branded park name was not provided in the reviewed announcement.

Announced / proposed development. Current leasing, resale and unit availability require confirmation.

Infrastructure & operational fit.

Project-level information provides a starting point. Confirm the actual plot, building and service allocation before making a commitment.

Power provisionInfrastructure specifications not yet published in reviewed announcementSource statement; actual unit and service confirmation required.
Floor loadingUnit-specific; no park-wide design-load specification verifiedSource statement; actual unit and service confirmation required.
Gas infrastructureNot published in reviewed primary sources; confirm unit connection and capacitySource statement; actual unit and service confirmation required.
Fibre & telecomsNot published in reviewed primary sources; confirm service and route diversitySource statement; actual unit and service confirmation required.
Highway corridorsSecond Link Expressway
Published park infrastructure does not establish an individual property’s allocated capacity, connection rights, floor rating or current availability. Project profile only. Current lease, resale, new-sale availability and terms require confirmation.

Additional infrastructure records.

PowerInfrastructure specifications not yet published in reviewed announcementUnknown · 31 October 2026Source ↗
Floor loadingUnit-specific; no park-wide design-load specification verifiedUnknown · 31 October 2026Source ↗
GasNot published in reviewed primary sources; confirm unit connection and capacityUnknown · 31 October 2026Source ↗
FibreNot published in reviewed primary sources; confirm service and route diversityUnknown · 31 October 2026Source ↗

Connections that matter.

Senai International AirportRoad distance not yet verified
Open driving route ↗
Johor PortRoad distance not yet verified
Open driving route ↗
Port of Tanjung PelepasRoad distance not yet verified
Open driving route ↗
Second Link CheckpointRoad distance not yet verified
Open driving route ↗

Source documents.

Explore industrial parks in Johor

Browse the Johor park directory ↗

Your next industrial address

Let’s put your operation on the map.

Leasing, industrial land acquisition and built-to-suit requirements.

Talk to our corporate desk ↗
0 parks in your shortlistCompare parks ↗