About German Technology Park, Melaka
German Technology Park, Melaka is in Jalan Gapam, Jasin, Melaka, Malaysia. The Teladan and MCORP development is along Jalan Gapam in the Jasin area and is marketed with Ayer Keroh location references.
Official scope descriptions differ: the 2024 joint announcement identified 341.2 acres, while Invest Melaka currently lists 418.63 acres across two phases. Confirm the marketed parcel and phase before relying on a total area.
Also known as: GTP Melaka · Taman Teknologi Jerman · German Technology Park Ayer Keroh
Infrastructure & operational fit.
Project-level information provides a starting point. Confirm the actual plot, building and service allocation before making a commitment.
| Power provision | Factory product page publishes 100 A provision; voltage, commissioning and individual service allocation require confirmationSource statement; actual unit and service confirmation required. |
|---|---|
| Floor loading | Factory product page describes ground-floor loading up to 7.5 kN/m²; obtain the structural specification for the selected building.Source statement; actual unit and service confirmation required. |
| Gas infrastructure | Gas connection and pipeline availability not verifiedSource statement; actual unit and service confirmation required. |
| Fibre & telecoms | Developer lists fibre-optic connectivity; installed carriers, route diversity and unit activation not verifiedSource statement; actual unit and service confirmation required. |
| Highway corridors | Jalan Gapam · North–South Expressway |
Additional infrastructure records.
| Power | Factory product page publishes 100 A provision; voltage, commissioning and individual service allocation require confirmationPublished factory product; confirm selected unitPublished current: 100 ASource stated · 31 October 2026Published specification or provision applies only to its stated phase, product and scope; individual capacity, commissioning and availability require confirmation.Source ↗ |
|---|---|
| Floor loading | Factory product page describes ground-floor loading up to 7.5 kN/m²; obtain the structural specification for the selected building.Published factory product; confirm selected unitPublished floor loading: 7.5 kN/m²Source stated · 31 October 2026Published specification or provision applies only to its stated phase, product and scope; individual capacity, commissioning and availability require confirmation.Source ↗ |
| Gas | Gas connection and pipeline availability not verifiedUnknown · 31 October 2026Published specification or provision applies only to its stated phase, product and scope; individual capacity, commissioning and availability require confirmation. |
| Fibre | Developer lists fibre-optic connectivity; installed carriers, route diversity and unit activation not verifiedSource stated · 31 October 2026Published specification or provision applies only to its stated phase, product and scope; individual capacity, commissioning and availability require confirmation.Source ↗ |
Connections that matter.
Project media & documents.
Source documents.
- Official German Technology Park developer profile and layout ↗ · Reviewed 31 October 2026
- Official factory specifications ↗ · Reviewed 31 October 2026
- Official industrial-land and fibre/security provision ↗ · Reviewed 31 October 2026
- Official September2026 site-progress record ↗ · Reviewed 31 October 2026
- MCORP: Riverwell/Teladan partnership and Ayer Panas location ↗ · Reviewed 31 October 2026
- Invest Melaka current two-phase area description ↗ · Reviewed 31 October 2026
- Teladan and MCORP joint announcement dated22March2024 ↗ · Reviewed 31 October 2026