industrialpark.my
Johor / Industrial park profile

i-TechHub

AME’s named 38-acre freehold industrial development in Senai, within the JS-SEZ. The official project overview marks it Upcoming and describes built-to-suit solutions for manufacturing, logistics and high-value industries.

JohorSenaiIndustrial parkUpcoming built-to-suit development
Developer promotional banner with a rendered factory for i-TechHub in Senai, Johor

i-TechHub · Official developer promotional graphic with artist illustration · Image credit: Official AME Development promotional graphic · Image source ↗

About i-TechHub

i-TechHub is in Senai, Johor, Malaysia. AME identifies the Senai project as upcoming and positions it for built-to-suit manufacturing, logistics and high-value industrial uses.

Upcoming. Current leasing, resale and unit availability require confirmation.

Infrastructure & operational fit.

Project-level information provides a starting point. Confirm the actual plot, building and service allocation before making a commitment.

Power provisionFuture-ready infrastructure described; no voltage, allocated supply capacity or energisation date publishedSource statement; actual unit and service confirmation required.
Floor loadingUnit-specific; no park-wide design-load specification verifiedSource statement; actual unit and service confirmation required.
Gas infrastructureNot published in reviewed primary sources; confirm unit connection and capacitySource statement; actual unit and service confirmation required.
Fibre & telecomsNot published in reviewed primary sources; confirm service and route diversitySource statement; actual unit and service confirmation required.
Published park infrastructure does not establish an individual property’s allocated capacity, connection rights, floor rating or current availability. Project profile only. Current lease, resale, new-sale availability and terms require confirmation.

Additional infrastructure records.

PowerFuture-ready infrastructure described; no voltage, allocated supply capacity or energisation date publishedUnknown · 31 October 2026Source ↗
Floor loadingUnit-specific; no park-wide design-load specification verifiedUnknown · 31 October 2026Source ↗
GasNot published in reviewed primary sources; confirm unit connection and capacityUnknown · 31 October 2026Source ↗
FibreNot published in reviewed primary sources; confirm service and route diversityUnknown · 31 October 2026Source ↗

Connections that matter.

Senai International AirportRoad distance not yet verified
Open driving route ↗
Johor PortRoad distance not yet verified
Open driving route ↗
Port of Tanjung PelepasRoad distance not yet verified
Open driving route ↗
Second Link CheckpointRoad distance not yet verified
Open driving route ↗

Source documents.

Explore industrial parks in Johor

Browse the Johor park directory ↗

Your next industrial address

Let’s put your operation on the map.

Leasing, industrial land acquisition and built-to-suit requirements.

Talk to our corporate desk ↗
0 parks in your shortlistCompare parks ↗