About iBP @ Nusajaya
iBP @ Nusajaya is in SiLC, Iskandar Puteri, Johor, Malaysia. The freehold industrial and business park was developed through THAB’s partnership with AME, Boustead, Tat Hong and CSC.
Boustead’s FY2018 annual report records THAB completing iBP @ Nusajaya. AMEConstruction labels its works completed in 2017. Current stock and present ownership interests require confirmation.
Also known as: IBP @ SiLC · iBP Nusajaya · IBP@Nusajaya
Infrastructure & operational fit.
Project-level information provides a starting point. Confirm the actual plot, building and service allocation before making a commitment.
| Power provision | Developer’s published general specification states 300A or 400A to the main switchboard; confirm type, installed supply and current allocated capacitySource statement; actual unit and service confirmation required. |
|---|---|
| Floor loading | Published design loads: 20kN/m² ground-floor production slab, 10kN/m² upper production floor and 4kN/m² office; confirm the particular buildingSource statement; actual unit and service confirmation required. |
| Gas infrastructure | No gas connection specification verifiedSource statement; actual unit and service confirmation required. |
| Fibre & telecoms | No fibre route or service-diversity specification verifiedSource statement; actual unit and service confirmation required. |
Published park infrastructure does not establish an individual property’s allocated capacity, connection rights, floor rating or current availability. Project profile only. Current lease, resale, new-sale availability and terms require confirmation.
Additional infrastructure records.
| Power | Developer’s published general specification states 300A or 400A to the main switchboard; confirm type, installed supply and current allocated capacitySource stated · 31 October 2026Source ↗ |
|---|---|
| Floor loading | Published design loads: 20kN/m² ground-floor production slab, 10kN/m² upper production floor and 4kN/m² office; confirm the particular buildingUnknown · 31 October 2026Source ↗ |
| Gas | No gas connection specification verifiedUnknown · 31 October 2026Source ↗ |
| Fibre | No fibre route or service-diversity specification verifiedUnknown · 31 October 2026Source ↗ |
Connections that matter.
Senai International AirportRoad distance not yet verified
Open driving route ↗Johor PortRoad distance not yet verified
Open driving route ↗Port of Tanjung PelepasRoad distance not yet verified
Open driving route ↗Second Link CheckpointRoad distance not yet verified
Open driving route ↗Source documents.
- Boustead confirms THAB partnership with AME and iBP development ↗ · Reviewed 31 October 2026
- Boustead FY2018 annual report / completed JV developments ↗ · Reviewed 31 October 2026
- THAB official developer-partner profile ↗ · Reviewed 31 October 2026
- THAB published building design loads and electrical specification ↗ · Reviewed 31 October 2026
- THAB official contact and published GPS point ↗ · Reviewed 31 October 2026
- AMEConstruction project record ↗ · Reviewed 31 October 2026
Explore industrial parks in Johor
Browse the Johor park directory ↗
- District 6 @ SiLC · SiLC, Iskandar Puteri
- Eco Business Park 8 · Mukim Kulai, Kulai–Sedenak, JS-SEZ Flagship F
- Eco Business Park 9 · IBTEC South, Mukim Bukit Batu, Kulai
