industrialpark.my
Selangor / Industrial park profile

IOI Industrial Park @ Banting

A phased industrial park for factory products, industrial land and logistics uses. IOI officially launched the development on 8 December 2025 and announced a data-centre land transaction in 2026.

SelangorKuala LangatIndustrial parkIndustrial land and factories
Developer aerial rendering of IOI Industrial Park at Banting in Kuala Langat, Selangor

IOI Industrial Park @ Banting · Developer aerial rendering · Image credit: IOI Properties Group official project illustration · Image source ↗

About IOI Industrial Park @ Banting

IOI Industrial Park @ Banting is in Banting, Kuala Langat, Selangor, Malaysia. IOI’s phased industrial development combines factory products, industrial land and logistics uses in South Selangor.

The official launch report described a two-phase programme with first-phase completion expected within two years; the project FAQ says three phases. Confirm the current phase breakdown and delivery dates.

Developer-published overall development area. Confirm the exact phase and plot schedule.

Also known as: IOI Industrial Park Banting · IOIIP Banting

Infrastructure & operational fit.

Project-level information provides a starting point. Confirm the actual plot, building and service allocation before making a commitment.

Power provisionDeveloper states connections to three high-voltage sources; the launched detached factory type lists 800 A. Verify commissioned connections, voltage and unit allocation.Source statement; actual unit and service confirmation required.
Floor loadingNo universal park-wide structural floor-load rating verified; confirm the selected factory type.Source statement; actual unit and service confirmation required.
Gas infrastructureGas connection and pipeline availability not verifiedSource statement; actual unit and service confirmation required.
Fibre & telecomsDeveloper states 5 G infrastructure; physical fibre carriers, routes and path diversity not verifiedSource statement; actual unit and service confirmation required.
Highway corridorsWCE · KLIA Extension Highway · ELITE · NSE · SKVE · Federal Highway · Putrajaya–Cyberjaya Expressway
Published park infrastructure does not establish an individual property’s allocated capacity, connection rights, floor rating or current availability. Basic directory profile. Current availability, terms and commissioned services require confirmation.

Additional infrastructure records.

PowerDeveloper states connections to three high-voltage sources; the launched detached factory type lists 800 A. Verify commissioned connections, voltage and unit allocation.Detached factory product launched December 2025Published current: 800 ASource stated · 31 October 2026Published specification or provision applies only to its stated phase, product and scope; individual capacity, commissioning and availability require confirmation.Source ↗
Floor loadingNo universal park-wide structural floor-load rating verified; confirm the selected factory type.Unknown · 31 October 2026Published specification or provision applies only to its stated phase, product and scope; individual capacity, commissioning and availability require confirmation.Source ↗
GasGas connection and pipeline availability not verifiedUnknown · 31 October 2026Published specification or provision applies only to its stated phase, product and scope; individual capacity, commissioning and availability require confirmation.
FibreDeveloper states 5 G infrastructure; physical fibre carriers, routes and path diversity not verifiedUnknown · 31 October 2026Published specification or provision applies only to its stated phase, product and scope; individual capacity, commissioning and availability require confirmation.

Connections that matter.

KLIA15 km · Developer-published distance; route basis unspecifiedDeveloper-published distances; unspecified gate and route method. Port Klang omitted because the official page gives conflicting 45 km/52 km figures.Measurement source ↗
Open driving route ↗
WCE Banting Interchange7 km · Developer-published distance; route basis unspecifiedDeveloper-published distances; unspecified gate and route method. Port Klang omitted because the official page gives conflicting 45 km/52 km figures.Measurement source ↗
Open driving route ↗

Project media & documents.

Source documents.

Explore industrial parks in Selangor

Browse the Selangor park directory ↗

Your next industrial address

Let’s put your operation on the map.

Leasing, industrial land acquisition and built-to-suit requirements.

Talk to our corporate desk ↗
0 parks in your shortlistCompare parks ↗