About KLK TechPark
KLK TechPark is in the Tanjong Malim–Behrang corridor in Perak, Malaysia. KLK Land’s automotive and advanced-manufacturing development is separate from i-Park @ Coalfields in Selangor.
Published industry focus: Automotive and electric vehicles · Advanced manufacturing · Industrial supply-chain vendors · Logistics
Developer-published overall scale: approximately 1,500 freehold acres, comprising 1,300 acres for industrial development and 200 acres for residential support. This is not the industrial net saleable area or a surveyed parcel boundary. The project illustration labels Phase 2 as 170 acres while the September 2025 launch announcement describes a 200-acre vendor park; confirm the current phase boundary and scheme.
Also known as: KLK TechPark @ Tanjong Malim · KLK Tech Park · KLK TechPark Tanjung Malim
Infrastructure & operational fit.
Project-level information provides a starting point. Confirm the actual plot, building and service allocation before making a commitment.
| Power provision | Essential infrastructure is announced; incoming voltage, energisation dates and allocated capacity for an individual plot have not been verifiedSource statement; actual unit and service confirmation required. |
|---|---|
| Floor loading | Product- and building-specific; no universal park-wide structural floor-loading rating verifiedSource statement; actual unit and service confirmation required. |
| Gas infrastructure | Gas pipeline availability and individual connection rights not verifiedSource statement; actual unit and service confirmation required. |
| Fibre & telecoms | Physical fibre routes, carriers and service diversity not verifiedSource statement; actual unit and service confirmation required. |
| Highway corridors | North–South Expressway · Behrang interchange corridor · Federal Route 1 corridor |
Additional infrastructure records.
| Power | Essential infrastructure is announced; incoming voltage, energisation dates and allocated capacity for an individual plot have not been verifiedUnknown · 1 November 2026 |
|---|---|
| Floor loading | Product- and building-specific; no universal park-wide structural floor-loading rating verifiedUnknown · 1 November 2026 |
| Gas | Gas pipeline availability and individual connection rights not verifiedUnknown · 1 November 2026 |
| Fibre | Physical fibre routes, carriers and service diversity not verifiedUnknown · 1 November 2026 |
Connections that matter.
Project media & documents.
Source documents.
- Official KLK TechPark master development, tenure, location and published distances ↗ · Reviewed 1 November 2026
- KLK Land official September 2025 launch and phased-development programme ↗ · Reviewed 1 November 2026
