About NCT Smart Industrial Park
NCT Smart Industrial Park is in the Kuala Langat corridor of South Selangor, Malaysia. This phased managed development in IDRISS records individual phase and handover milestones separately.
Approximately 910 acres in the developer’s September 2026 expanded master plan. Older 732–732.5-acre descriptions refer to an earlier scheme; confirm the specific phase and plot boundary.
Also known as: NSIP · Taman Perindustrian Pintar NCT
Infrastructure & operational fit.
Project-level information provides a starting point. Confirm the actual plot, building and service allocation before making a commitment.
| Power provision | Dual-source electricity provision listed by developer; incoming voltage, commissioned connections and available unit capacity require confirmationSource statement; actual unit and service confirmation required. |
|---|---|
| Floor loading | Specifications vary by factory type and phase; confirm the selected building’s approved structural loadingSource statement; actual unit and service confirmation required. |
| Gas infrastructure | Gas provision listed by developer; network commissioning and individual unit connection require confirmationSource statement; actual unit and service confirmation required. |
| Fibre & telecoms | 5G connectivity stated by developer; fibre routes, carrier availability and physical path diversity not verifiedSource statement; actual unit and service confirmation required. |
| Highway corridors | ELITE · KLIA Expressway · Klang–Banting Highway · MEX · KESAS · SKVE |
Additional infrastructure records.
| Power | Dual-source electricity provision listed by developer; incoming voltage, commissioned connections and available unit capacity require confirmationSource stated · 31 October 2026Source ↗ |
|---|---|
| Floor loading | Specifications vary by factory type and phase; confirm the selected building’s approved structural loadingUnknown · 31 October 2026Source ↗ |
| Gas | Gas provision listed by developer; network commissioning and individual unit connection require confirmationSource stated · 31 October 2026Source ↗ |
| Fibre | 5G connectivity stated by developer; fibre routes, carrier availability and physical path diversity not verifiedUnknown · 31 October 2026Source ↗ |
Connections that matter.
Source documents.
- Official September 2026 Phase 1 handover, KM2 launch and expanded master plan ↗ · Reviewed 31 October 2026
- NCT Alliance official project profile and map links ↗ · Reviewed 31 October 2026
- Official developer-linked microsite / utility provision ↗ · Reviewed 31 October 2026
- Official microsite / network accessibility ↗ · Reviewed 31 October 2026
Explore industrial parks in Selangor
Browse the Selangor park directory ↗