Johor / Industrial park profile

Nexus Sedenak

Nexus Sedenak is SOCAT’s phased industrial and innovation district at Ladang Air Manis in Kulai, Johor. The overall 2,940-acre masterplan combines industry and logistics with agri-innovation, commercial and residential uses.

SedenakKulaiJohorSOCAT
SOCAT artist impression of the Nexus Sedenak industrial and innovation district masterplan in Kulai, Johor

Nexus Sedenak / SOCAT Innovation District · Developer masterplan artist impression from the official brochure, page 7; illustrative, not a photograph of completed facilities. · Image credit: Southern Catalyst Sdn Bhd (SOCAT), official development brochure · Image source ↗

About Nexus Sedenak

Nexus Sedenak is in Mukim Sedenak, Kulai district, Johor. SOCAT places the development approximately 3 km from Sedenak toll plaza on the North–South Expressway. Its industrial and logistics plans sit within a wider mixed-use district; rail and cargo components remain subject to delivery confirmation.

SOCAT’s business page and brochure also use SOCAT Innovation District. The Nexus Sedenak launch and tender pages identify the current project name.

Launched on 11 June 2026. SOCAT’s 22 September 2026 notices describe proposed water and sewage-treatment works. The inland cargo hub and commuter/cargo rail station are planned components; their commissioning and actual services have not been verified.

Project address: Ladang Air Manis, KM51, Jalan Johor Bahru–Air Hitam, 81000, Sedenak, Kulai, Johor

Published industry focus: AgriTech and FoodTech manufacturing · Biopharmaceuticals · Integrated logistics · General manufacturing

The 2,940 acres describe the overall mixed-use master development, including supporting uses, rather than net industrial or saleable land. Confirm the selected phase and title.

Also known as: SOCAT Innovation District · Southern Catalyst Innovation District · Nexus Sedenak Industrial Park · Ladang Air Manis

Infrastructure & operational fit.

Project-level information provides a starting point. Confirm the actual plot, building and service allocation before making a commitment.

Power provisionScalable power provision is described by SOCAT; incoming voltage, commissioned capacity and individual plot allocations are unverifiedSource statement; actual unit and service confirmation required.
Floor loadingNot publishedSource statement; actual unit and service confirmation required.
Gas infrastructureNot publishedSource statement; actual unit and service confirmation required.
Fibre & telecomsFibre connectivity is described by SOCAT; carrier routes, diversity and phase commissioning require confirmationSource statement; actual unit and service confirmation required.
WaterZone 1 tender design: Phase 1 12.0 MLD, with ultimate 32.5 MLD; proposed system capacity, not confirmed commissioned supply or plot allocationSource statement; actual unit and service confirmation required.
Highway corridorsNorth–South Expressway · Sedenak toll plaza corridor · Jalan Johor Bahru–Air Hitam
Published park infrastructure does not establish an individual property’s allocated capacity, connection rights, floor rating or current availability. Confirm phase delivery, plot or building availability, industrial use approval and commercial terms. No automatic tax incentive or customs-zone eligibility is implied.

Additional infrastructure records.

PowerScalable power provision is described by SOCAT; incoming voltage, commissioned capacity and individual plot allocations are unverifiedPlanned · 10 November 2026Source ↗
FibreFibre connectivity is described by SOCAT; carrier routes, diversity and phase commissioning require confirmationPlanned · 10 November 2026Source ↗
WaterZone 1 tender design: Phase 1 12.0 MLD, with ultimate 32.5 MLD; proposed system capacity, not confirmed commissioned supply or plot allocationZone 1, Phase 1Published water capacity: 12000 m³/dayPlanned · 10 November 202622 September 2026 tender design capacity; not an operating supply or individual allocation.Source ↗
OtherProposed Module 1 sewage treatment: 26,500 PE of ultimate 53,000 PE, per September 2026 tender. Commissioning is unverified.Planned · 10 November 2026Source ↗
OtherPlanned rail-linked inland cargo hub, warehousing and cold storage; proposed commuter/cargo station. Operational rail connection has not been verified.Planned · 10 November 2026Source ↗

Connections that matter.

Sedenak toll plaza3 km · Developer-published distance; route basis unspecified · 10 November 2026Nexus Sedenak / SOCAT Innovation District, phase not specifiedDeveloper-published distance; origin, route and measurement method are unspecified. Confirm the selected gate and truck route.Measurement source ↗
Open driving route ↗

Project media & documents.

Source documents.

Explore industrial parks in Johor

Browse the Johor park directory ↗

Your next industrial address

Let’s put your operation on the map.

Leasing, industrial land acquisition and built-to-suit requirements.

Talk to our corporate desk ↗
0 parks in your shortlistCompare parks ↗