About Samalaju Industrial Park
Samalaju Industrial Park is in Samalaju, Bintulu Division, Sarawak, Malaysia. The SCORE estate supports aluminium, ferroalloy and polysilicon operations, with a dedicated industrial port and regional power connections.
Published industry focus: Aluminium and downstream metals · Ferroalloys and steel-related manufacturing · Polysilicon and glass-based industries · Industrial gases · Oil and gas-related industry
RECODA describes the overall industrial park as over 8,000 hectares; MIDA’s May 2025 overview uses 8,000 hectares. This is the wider industrial estate, not current vacant or net saleable land. No exact acre value is adopted.
Also known as: SIP · Taman Perindustrian Samalaju · Samalaju Industrial Estate
Infrastructure & operational fit.
Project-level information provides a starting point. Confirm the actual plot, building and service allocation before making a commitment.
| Power provision | Hydroelectric generation supports the regional supply network. Sarawak Energy confirms the commissioned Murum–Samalaju B 275kV transmission connection; selected-plot voltage, available capacity and connection terms require confirmation.Source statement; actual unit and service confirmation required. |
|---|---|
| Floor loading | Building-specific; no universal estate-wide floor-loading rating verified.Source statement; actual unit and service confirmation required. |
| Gas infrastructure | Industrial gas production is established in the park, but that does not establish a park-wide natural-gas pipeline or an individual plot’s connection entitlement.Source statement; actual unit and service confirmation required. |
| Fibre & telecoms | No park-wide fibre route, carrier, throughput or path-diversity specification verified.Source statement; actual unit and service confirmation required. |
| Water | The water operator describes an 80 MLD design capacity for the Samalaju treatment plant. A separate upgrade to 200 MLD is described in official project updates; completion and additional available supply are not established here.Source statement; actual unit and service confirmation required. |
| Highway corridors | Samalaju coastal road network |
Additional infrastructure records.
| Power | Hydroelectric generation supports the regional supply network. Sarawak Energy confirms the commissioned Murum–Samalaju B 275kV transmission connection; selected-plot voltage, available capacity and connection terms require confirmation.Regional power network; individual allocation unverifiedSource stated · 1 November 2026A transmission-network connection is not an individual plot supply voltage or guaranteed spare capacity.Source ↗ |
|---|---|
| Substation | Samalaju B 275kV Substation is linked to Murum HEP by the commissioned 275kV transmission line.Transmission-network reference · Sarawak EnergyPublished voltage: 275 kVSource stated · 1 November 2026Network voltage only. No verified substation coordinates, plot allocation or spare capacity adopted.Source ↗ |
| Water | The water operator describes an 80 MLD design capacity for the Samalaju treatment plant. A separate upgrade to 200 MLD is described in official project updates; completion and additional available supply are not established here.Water-treatment-plant design capacity and service area · Sarawak WaterPublished water capacity: 80000 m³/daySource stated · 1 November 202680 MLD is plant design capacity for its service area, not supply reserved for SIP or spare capacity for an individual plot. Do not treat the proposed 200 MLD upgrade as commissioned.Source ↗ |
| Floor loading | Building-specific; no universal estate-wide floor-loading rating verified.Unknown · 1 November 2026 |
| Gas | Industrial gas production is established in the park, but that does not establish a park-wide natural-gas pipeline or an individual plot’s connection entitlement.Unknown · 1 November 2026Industrial-gas manufacturing is not evidence of a natural-gas distribution connection.Source ↗ |
| Fibre | No park-wide fibre route, carrier, throughput or path-diversity specification verified.Unknown · 1 November 2026 |
Connections that matter.
Recorded utility references.
These are reference locations, not confirmation of a connection, voltage or spare capacity.
- Samalaju B 275kV Substation is linked to Murum HEP by the commissioned 275kV transmission line.Published reference · 275 kV stated · Capacity unverifiedNetwork voltage only. No verified substation coordinates, plot allocation or spare capacity adopted. · Source ↗
Project media & documents.
Source documents.
- RECODA official SCORE and Samalaju Industrial Park overview ↗ · Reviewed 1 November 2026
- MIDA May 2025 Samalaju operations and infrastructure project update ↗ · Reviewed 1 November 2026
- Sarawak Energy January 2023 commissioning of Murum–Samalaju B 275kV network ↗ · Reviewed 1 November 2026
- Sarawak Water official Samalaju treatment-plant design capacity and coverage ↗ · Reviewed 1 November 2026