Serenia Industrial Park

An industrial precinct in Sepang with detached and semi-detached factory phases. Official project literature describes solar-ready roofs, rainwater harvesting and loading-bay provision.

SelangorSepangIndustrial parkFactory precinct
Developer artist impression of a detached factory at Serenia Industrial Park in Sepang, Selangor

Serenia Industrial Park · Developer artist impression · Image credit: Sime Darby Property official project illustration · Image source ↗

About Serenia Industrial Park

Serenia Industrial Park is in Bandar Serenia, Sepang, Selangor, Malaysia. The industrial precinct within Serenia City includes detached and semi-detached factory phases with published building features.

The developer marks Phases 3/3 A and S-Series Phases 5/6 fully sold. This sales status does not verify park-wide completion, occupation or resale availability.

Approximately 112-acre industrial precinct within the wider Serenia City township; the township area is not the park area.

Also known as: Serenia City Industrial Park · Serenia Industrial Park Sepang

Infrastructure & operational fit.

Project-level information provides a starting point. Confirm the actual plot, building and service allocation before making a commitment.

Power provisionPhase 3 Type A: 400 A published provision; confirm incoming voltage and actual service allocation. Phase 3 Type D: 200 A published provision; confirm incoming voltage and actual service allocation. Phase 3 A Type B: 400 A published provision; confirm incoming voltage and actual service allocation. Phase 3 A Type C: 300 A published provision; confirm incoming voltage and actual service allocation.Source statement; actual unit and service confirmation required.
Floor loadingPhase 3 Type A: 15 kN/m² published floor-loading specification; confirm the selected unit structural schedule. Phase 3 Type D: 10 kN/m² published floor-loading specification; confirm the selected unit structural schedule. Phase 3 A Type B: 15 kN/m² published floor-loading specification; confirm the selected unit structural schedule. Phase 3 A Type C: 15 kN/m² published floor-loading specification; confirm the selected unit structural schedule.Source statement; actual unit and service confirmation required.
Gas infrastructureGas connection and pipeline availability not verifiedSource statement; actual unit and service confirmation required.
Fibre & telecomsFibre carriers, routes and path diversity not verifiedSource statement; actual unit and service confirmation required.
Published park infrastructure does not establish an individual property’s allocated capacity, connection rights, floor rating or current availability. Basic directory profile. Current availability, terms and commissioned services require confirmation.

Additional infrastructure records.

GasGas connection and pipeline availability not verifiedUnknown · 31 October 2026Published specification or provision applies only to its stated phase, product and scope; individual capacity, commissioning and availability require confirmation.
PowerPhase 3 Type A: 400 A published provision; confirm incoming voltage and actual service allocation.Phase 3 · Type APublished current: 400 ASource stated · 31 October 2026Source ↗
FibreFibre carriers, routes and path diversity not verifiedUnknown · 31 October 2026Published specification or provision applies only to its stated phase, product and scope; individual capacity, commissioning and availability require confirmation.
Floor loadingPhase 3 Type A: 15 kN/m² published floor-loading specification; confirm the selected unit structural schedule.Phase 3 · Type APublished floor loading: 15 kN/m²Source stated · 31 October 2026Source ↗
PowerPhase 3 Type D: 200 A published provision; confirm incoming voltage and actual service allocation.Phase 3 · Type DPublished current: 200 ASource stated · 31 October 2026Source ↗
Floor loadingPhase 3 Type D: 10 kN/m² published floor-loading specification; confirm the selected unit structural schedule.Phase 3 · Type DPublished floor loading: 10 kN/m²Source stated · 31 October 2026Source ↗
PowerPhase 3 A Type B: 400 A published provision; confirm incoming voltage and actual service allocation.Phase 3 A · Type BPublished current: 400 ASource stated · 31 October 2026Source ↗
Floor loadingPhase 3 A Type B: 15 kN/m² published floor-loading specification; confirm the selected unit structural schedule.Phase 3 A · Type BPublished floor loading: 15 kN/m²Source stated · 31 October 2026Source ↗
PowerPhase 3 A Type C: 300 A published provision; confirm incoming voltage and actual service allocation.Phase 3 A · Type CPublished current: 300 ASource stated · 31 October 2026Source ↗
Floor loadingPhase 3 A Type C: 15 kN/m² published floor-loading specification; confirm the selected unit structural schedule.Phase 3 A · Type CPublished floor loading: 15 kN/m²Source stated · 31 October 2026Source ↗

Connections that matter.

Westports MalaysiaRoad distance not yet verified
Open driving route ↗
Northport MalaysiaRoad distance not yet verified
Open driving route ↗
KLIARoad distance not yet verified
Open driving route ↗
Subang AirportRoad distance not yet verified
Open driving route ↗

Project media & documents.

Source documents.

Explore industrial parks in Selangor

Browse the Selangor park directory ↗

Your next industrial address

Let’s put your operation on the map.

Leasing, industrial land acquisition and built-to-suit requirements.

Talk to our corporate desk ↗
0 parks in your shortlistCompare parks ↗