About Silicon Island, Penang
Silicon Island is under reclamation off the southern coast of Penang Island, Malaysia. Its planned Green Tech Park targets advanced manufacturing; the future industrial zone is not a completed operating estate.
Approximately 2,300 acres describes the whole mixed-use island. The developer separately identifies a 700-acre Green Tech Park industrial zone; these are different scopes.
Also known as: Penang Silicon Island · PSI Island A · Silicon Island Green Tech Park
Infrastructure & operational fit.
Project-level information provides a starting point. Confirm the actual plot, building and service allocation before making a commitment.
| Power provision | Renewable-energy infrastructure is planned for Green Tech Park; commissioned supply, incoming voltage and unit capacity are unconfirmedSource statement; actual unit and service confirmation required. |
|---|---|
| Floor loading | Future building-specific specification; no park-wide floor-load rating verifiedSource statement; actual unit and service confirmation required. |
| Gas infrastructure | No park-specific gas connection or commissioned pipeline verifiedSource statement; actual unit and service confirmation required. |
| Fibre & telecoms | High-speed digital connectivity is planned; fibre routes, carriers and commissioning are unverifiedSource statement; actual unit and service confirmation required. |
Additional infrastructure records.
| Power | Renewable-energy infrastructure is planned for Green Tech Park; commissioned supply, incoming voltage and unit capacity are unconfirmedSource stated · 31 October 2026Published specification or provision applies only to its stated phase, product and scope; individual capacity, commissioning and availability require confirmation.Source ↗ |
|---|---|
| Floor loading | Future building-specific specification; no park-wide floor-load rating verifiedUnknown · 31 October 2026Published specification or provision applies only to its stated phase, product and scope; individual capacity, commissioning and availability require confirmation. |
| Gas | No park-specific gas connection or commissioned pipeline verifiedUnknown · 31 October 2026Published specification or provision applies only to its stated phase, product and scope; individual capacity, commissioning and availability require confirmation. |
| Fibre | High-speed digital connectivity is planned; fibre routes, carriers and commissioning are unverifiedUnknown · 31 October 2026Published specification or provision applies only to its stated phase, product and scope; individual capacity, commissioning and availability require confirmation. |
Connections that matter.
Project media & documents.
Source documents.
- Official island / Green Tech Park scope, tenure and development timeline ↗ · Reviewed 31 October 2026
- Official October 2026 reclamation milestone ↗ · Reviewed 31 October 2026
- Official developer entity and PIC PD / SRS PD ownership ↗ · Reviewed 31 October 2026
- Gamuda official reclamation construction project ↗ · Reviewed 31 October 2026
Explore industrial parks in Penang
Browse the Penang park directory ↗
- Batu Kawan Industrial Park · Bandar Cassia, South Seberang Perai
- Northern TechValley @ BKE · Kubang Semang / Seberang Perai
- Penang Science Park · Bukit Minyak / Simpang Ampat, Seberang Perai Tengah