About Tok Bali Industrial Park

Tok Bali Industrial Park is in Tok Bali, Pasir Puteh, Kelantan, Malaysia. The developing industrial park is distinct from Tok Bali Integrated Fisheries Park and Tok Bali Supply Base.

TBIP is a separate industrial development supported by nearby TBIFP and the Tok Bali Supply Base. These names are not interchangeable.

ECERDC’s 28 October 2026 release reports TBIP physical progress at 54%. Planned utility and road infrastructure must not be treated as commissioned for every plot; current handover and occupation dates require confirmation.

Published industry focus: General manufacturing · Agricultural downstream processing · Metal fabrication · Construction and building materials · Value-added assembly

ECERDC describes approximately 81 hectares. Its development-plan schedule totals 81.489 hectares across Phases 1A, 1B and 2; confirm the actual parcel and phase extent.

Also known as: TBIP · Taman Industri Tok Bali · Taman Perindustrian Tok Bali

Infrastructure & operational fit.

Project-level information provides a starting point. Confirm the actual plot, building and service allocation before making a commitment.

Power provisionECERDC’s development plan shows transmission intake, divider and electrical-substation infrastructure; energisation, incoming voltage and individual allocation require confirmationSource statement; actual unit and service confirmation required.
Floor loadingBuilding-specific; no universal park-wide structural floor-loading rating verifiedSource statement; actual unit and service confirmation required.
Gas infrastructureGas pipeline provision, commissioning and plot-specific connection rights not verifiedSource statement; actual unit and service confirmation required.
Fibre & telecomsTelecommunications provision does not establish fibre carriers, physical route diversity or a unit service allocationSource statement; actual unit and service confirmation required.
WaterThe development plan lists a 4.1 million-litre/day water-supply design and 6,000 PE sewerage-treatment design. These are park infrastructure design figures, not an individual plot allocation or commissioning certificate.Source statement; actual unit and service confirmation required.
Highway corridorsPasir Puteh–Tok Bali Road (FT482) · Central Spine Road / Lingkaran Tengah Utama corridor · East Coast Expressway Phase 3 (LPT3) — future proposal
Published park infrastructure does not establish an individual property’s allocated capacity, connection rights, floor rating or current availability. Basic directory profile. Confirm the chosen phase or property’s availability, terms, permitted activities and commissioned services.

Additional infrastructure records.

PowerECERDC’s development plan shows transmission intake, divider and electrical-substation infrastructure; energisation, incoming voltage and individual allocation require confirmationSource stated · 1 November 2026Source ↗
Floor loadingBuilding-specific; no universal park-wide structural floor-loading rating verifiedUnknown · 1 November 2026
GasGas pipeline provision, commissioning and plot-specific connection rights not verifiedUnknown · 1 November 2026
FibreTelecommunications provision does not establish fibre carriers, physical route diversity or a unit service allocationUnknown · 1 November 2026
WaterThe development plan lists a 4.1 million-litre/day water-supply design and 6,000 PE sewerage-treatment design. These are park infrastructure design figures, not an individual plot allocation or commissioning certificate.Source stated · 1 November 2026Source ↗

Connections that matter.

Sultan Ismail Petra Airport50 km · Developer-published distance; route basis unspecifiedECERDC promotional graphic distances; intended gates and measurement method unspecified. These are not verified current road measurements.Measurement source ↗
Open driving route ↗
Tok Bali Supply Base8 km · Developer-published distance; route basis unspecifiedECERDC promotional graphic distances; intended gates and measurement method unspecified. These are not verified current road measurements.Measurement source ↗
Open driving route ↗

Project media & documents.

Source documents.

Explore industrial parks in Kelantan

Browse the Kelantan park directory ↗

Your next industrial address

Let’s put your operation on the map.

Leasing, industrial land acquisition and built-to-suit requirements.

Talk to our corporate desk ↗
0 parks in your shortlistCompare parks ↗