A phased UMW Development industrial park focused on aerospace, automotive and advanced manufacturing. The operator markets managed security, industrial infrastructure and business-support services across its northern and southern development zones.

SelangorHulu SelangorIndustrial parkHigh-value manufacturing
Aerial view of manufacturing facilities, internal roads and development plots at UMW High Value Manufacturing Park in Serendah, Selangor

Developer aerial photograph of UMW High Value Manufacturing Park in Serendah, showing manufacturing facilities, internal roads and development plots. · Image credit: UMW Development Sdn Bhd · Image source ↗

About UMW High Value Manufacturing Park

UMW High Value Manufacturing Park is in Serendah, Hulu Selangor, Selangor, Malaysia. The phased UMW Development park serves aerospace, automotive and advanced manufacturing across northern and southern development zones.

The current operator markets the park and its northern/southern zones. KKR’s May 2026 project record reports handover of the new connection from Federal Route FT3208 to the park’s 132-foot road. This access-road milestone does not establish completion of every precinct. The June 2024 presentation’s proposed CLQ and transport dates remain dated proposals unless separately confirmed.

Published industry focus: Aerospace · Automotive · Advanced manufacturing · Industrial technology

The current operator describes an 861-acre overall development. The dated June 2024 presentation separately totals 563 acres of identified precinct/commercial plots; that layout subtotal is not the entire park area.

Also known as: UMW HVM Park · UMW HVMP · UMW High-Value Manufacturing Park Serendah · Bandar Industri Bernilai Tinggi Serendah · Sime UMW HVM Park

Infrastructure & operational fit.

Project-level information provides a starting point. Confirm the actual plot, building and service allocation before making a commitment.

Power provisionElectricity infrastructure listed; confirm selected precinct energisation, incoming voltage and allocated load.Source statement; actual unit and service confirmation required.
Floor loadingNo universal park-wide floor-loading rating verified; obtain the selected building’s structural schedule.Source statement; actual unit and service confirmation required.
Gas infrastructureOperator lists gas utilities; dated June 2024 presentation also lists a gas pipeline. Confirm the relevant precinct and actual connection.Source statement; actual unit and service confirmation required.
Fibre & telecomsJune 2024 presentation lists fibre broadband; carriers, physical paths, service diversity and activation remain unverified.Source statement; actual unit and service confirmation required.
Highway corridorsNorth–South Expressway · Rawang Bypass · Federal Route 1 corridor · FT3208 access-road connection
Published park infrastructure does not establish an individual property’s allocated capacity, connection rights, floor rating or current availability. Basic directory profile. Confirm the selected precinct/property’s current availability, terms and commissioned services.

Additional infrastructure records.

PowerElectricity infrastructure listed; confirm selected precinct energisation, incoming voltage and allocated load.Source statedOperator provision statement does not establish spare capacity or connection entitlement for a specific unit.Source ↗
Floor loadingNo universal park-wide floor-loading rating verified; obtain the selected building’s structural schedule.Unknown
GasOperator lists gas utilities; dated June 2024 presentation also lists a gas pipeline. Confirm the relevant precinct and actual connection.Source statedSource ↗
FibreJune 2024 presentation lists fibre broadband; carriers, physical paths, service diversity and activation remain unverified.Source statedDated developer presentation, not a current carrier service-level or route certificate.Source ↗
RoadsOperator describes internal roads up to 100 feet wide in the Northern Zone. Check the actual plot access, junction and heavy-vehicle route.Northern ZoneSource statedSource ↗
SecurityOperator advertises a managed park with multi-tiered security, controlled ingress/egress and patrols; verify the services applying to the selected precinct.Source statedSource ↗

Connections that matter.

Sungai Buaya interchange8 km · Developer-published distance; route basis unspecifiedDistances shown in the developer presentation dated 13 June 2024. Origin/gates and measurement basis are unspecified; verify current industrial vehicle routes.Measurement source ↗
Open driving route ↗
Bukit Beruntung interchange10 km · Developer-published distance; route basis unspecifiedDistances shown in the developer presentation dated 13 June 2024. Origin/gates and measurement basis are unspecified; verify current industrial vehicle routes.Measurement source ↗
Open driving route ↗
Rawang Bypass4 km · Developer-published distance; route basis unspecifiedDistances shown in the developer presentation dated 13 June 2024. Origin/gates and measurement basis are unspecified; verify current industrial vehicle routes.Measurement source ↗
Open driving route ↗

Project media & documents.

Source documents.

Explore industrial parks in Selangor

Browse the Selangor park directory ↗

Your next industrial address

Let’s put your operation on the map.

Leasing, industrial land acquisition and built-to-suit requirements.

Talk to our corporate desk ↗
0 parks in your shortlistCompare parks ↗