industrialpark.my
Johor / Industrial park profile

Eco Business Park II

EcoWorld’s 383-acre freehold industrial development at Senai Airport City offers industrial land and several ready-built factory formats. Existing business operations sit alongside later factory and commercial phases marketed through EcoWorld Industrial Platform.

JohorSenaiSenai Airport CityIndustrial park
Developer aerial progress photograph of detached factory buildings and construction works at Eco Business Park II in Senai, Johor

Eco Business Park II · Developer detached-factory progress photograph; linked homepage update dated 1 October 2026, independent capture date not stated · Image credit: EcoWorld · Image source ↗

About Eco Business Park II

Eco Business Park II is in Senai Airport City, Senai, Johor, Malaysia. EcoWorld publishes a 383-acre gross freehold development with industrial land and multiple factory formats, with later phase works reported separately.

The official homepage's 1 October 2026 update states that detached-factory foundation, structure and architecture are complete while M&E, external and defect works continue. Eco Walk 2 works are separately reported. Do not describe every factory or the entire park as completed or immediately operational.
EcoWorld’s separately listed 383-acre park forms part of the wider Senai Airport City development; its acreage is not additional to the master estate. View Senai Airport City ↗

Whole-park gross freehold development scope in current developer product brochures. A one-acre detached-factory product is not the total park area.

Also known as: Eco Business Park 2 · EBP II · EBP2 · Eco Business Park Senai

Infrastructure & operational fit.

Project-level information provides a starting point. Confirm the actual plot, building and service allocation before making a commitment.

Power provisionThe current one-acre detached-factory brochure specifies 400 V three-phase supply set at 600 A, terminating at the main switchboard. This is a product specification, not a park-wide incoming-voltage or spare-capacity guarantee.Source statement; actual unit and service confirmation required.
Floor loading10 kN/m² is advertised for the one-acre detached-factory product; other types, slabs and floors require their own approved structural specificationsSource statement; actual unit and service confirmation required.
Gas infrastructureGas pipeline provision and individual connection availability not verified in reviewed official sourcesSource statement; actual unit and service confirmation required.
Fibre & telecomsCurrent product brochure advertises high-speed broadband and integrated utilities. Physical fibre routes, providers, path diversity and redundancy are not specified.Source statement; actual unit and service confirmation required.
Highway corridorsNorth–South Expressway · Senai–Desaru Expressway · Skudai Highway · Second Link Expressway · Pasir Gudang Expressway · Eastern Dispersal Link (EDL)
Published park infrastructure does not establish an individual property’s allocated capacity, connection rights, floor rating or current availability. Basic directory profile. Confirm actual unit or plot availability, title conditions, handover and commissioned utility connections for the selected property.

Additional infrastructure records.

PowerThe current one-acre detached-factory brochure specifies 400 V three-phase supply set at 600 A, terminating at the main switchboard. This is a product specification, not a park-wide incoming-voltage or spare-capacity guarantee.One-acre detached-factory product; selected unit and live connection require confirmation · One-acre Detached FactoryPublished voltage: 0.4 kVPublished current: 600 ASource stated · 1 November 2026Official detached-factory brochure specifies 400 V three-phase at 600 A terminating at the main switchboard. 400 V is represented as 0.4 kV by unit conversion only. Product provision is not park incoming voltage or currently available capacity.Source ↗
Floor loading10 kN/m² is advertised for the one-acre detached-factory product; other types, slabs and floors require their own approved structural specificationsOne-acre detached-factory product; selected unit and live connection require confirmation · One-acre Detached FactoryPublished floor loading: 10 kN/m²Source stated · 1 November 2026Official detached-factory brochure advertises 10 kN/m² for this product; no rating is assigned to all park units or every floor.Source ↗
GasGas pipeline provision and individual connection availability not verified in reviewed official sourcesUnknown · 1 November 2026
FibreCurrent product brochure advertises high-speed broadband and integrated utilities. Physical fibre routes, providers, path diversity and redundancy are not specified.Unknown · 1 November 2026High-speed broadband is advertised; physical fibre medium, routes, provider and redundancy remain unverified. Portfolio-level redundant-fibre claims are not assigned to this park.Source ↗

Connections that matter.

North–South Expressway3 km · Developer-published distance; route basis unspecified · 1 November 2026Developer-published marketing distances; start point and route basis not specified. Not independent Google road measurements.Measurement source ↗
Open driving route ↗
Senai–Desaru Expressway4 km · Developer-published distance; route basis unspecified · 1 November 2026Developer-published marketing distances; start point and route basis not specified. Not independent Google road measurements.Measurement source ↗
Open driving route ↗
Senai International Airport7 km · Developer-published distance; route basis unspecified · 1 November 2026Developer-published marketing distances; start point and route basis not specified. Not independent Google road measurements.Measurement source ↗
Open driving route ↗
Singapore Changi Airport55 km · Developer-published distance; route basis unspecified · 1 November 2026Developer-published marketing distances; start point and route basis not specified. Not independent Google road measurements.Measurement source ↗
Open driving route ↗

Project media & documents.

Source documents.

Explore industrial parks in Johor

Browse the Johor park directory ↗

Your next industrial address

Let’s put your operation on the map.

Leasing, industrial land acquisition and built-to-suit requirements.

Talk to our corporate desk ↗
0 parks in your shortlistCompare parks ↗