industrialpark.my
Johor / Industrial park profile

Senai Airport City

MMC Group’s integrated industrial development provides industrial land and primary infrastructure for manufacturing and logistics. Free-zone and non-free-zone areas serve different operating requirements; i-Park @ Senai Airport City is a separately listed development within the wider master development.

JohorKulaiIndustrial parkIndustrial master development
Developer photograph of the Senai Airport City Free Zone main gate in Kulai, Johor

Senai Airport City Free Zone main gate · Official developer photograph · Image credit: Senai Airport City / MMC Group · Image source ↗

About Senai Airport City

Senai Airport City is in Senai, Kulai, Johor, Malaysia. MMC’s master development includes free-zone and non-free-zone areas; i-Park @ Senai Airport City is a separately listed campus within it.

Master developer describes phased development and active manufacturing/logistics occupiers. A profile of the master development does not establish the availability or completion of an individual parcel. Free-zone status must be checked for the specific site.

Related park and precinct profiles

Master developer states a 2,718-acre integrated development, including free-zone and non-free-zone areas. Individual precincts have separate scopes.

Also known as: SAC · Senai Airport City Industrial Park

Infrastructure & operational fit.

Project-level information provides a starting point. Confirm the actual plot, building and service allocation before making a commitment.

Power provisionMaster developer lists power infrastructure; incoming voltage, commissioned connections and individual allocated capacity require confirmationSource statement; actual unit and service confirmation required.
Floor loadingProperty-specific; no universal master-development floor-load rating verifiedSource statement; actual unit and service confirmation required.
Gas infrastructureGas provision listed by master developer; network commissioning and unit connection require confirmationSource statement; actual unit and service confirmation required.
Fibre & telecomsTelecommunication infrastructure listed; physical fibre routes, carriers and path diversity not verifiedSource statement; actual unit and service confirmation required.
WaterWater and sewage-treatment infrastructure listed; service capacity for the selected parcel requires confirmationSource statement; actual unit and service confirmation required.
Highway corridorsNorth–South Expressway · Senai–Desaru Expressway · Second Link Expressway
Published park infrastructure does not establish an individual property’s allocated capacity, connection rights, floor rating or current availability. Basic directory profile. Confirm the selected property’s availability, terms and commissioned infrastructure.

Additional infrastructure records.

PowerMaster developer lists power infrastructure; incoming voltage, commissioned connections and individual allocated capacity require confirmationSource stated · 31 October 2026Published specification or provision applies only to its stated phase, product and scope; individual capacity, commissioning and availability require confirmation.Source ↗
Floor loadingProperty-specific; no universal master-development floor-load rating verifiedUnknown · 31 October 2026Published specification or provision applies only to its stated phase, product and scope; individual capacity, commissioning and availability require confirmation.
GasGas provision listed by master developer; network commissioning and unit connection require confirmationSource stated · 31 October 2026Published specification or provision applies only to its stated phase, product and scope; individual capacity, commissioning and availability require confirmation.Source ↗
FibreTelecommunication infrastructure listed; physical fibre routes, carriers and path diversity not verifiedUnknown · 31 October 2026Published specification or provision applies only to its stated phase, product and scope; individual capacity, commissioning and availability require confirmation.
WaterWater and sewage-treatment infrastructure listed; service capacity for the selected parcel requires confirmationSource stated · 31 October 2026Source ↗

Connections that matter.

Senai International AirportRoad distance not yet verified
Open driving route ↗
Johor PortRoad distance not yet verified
Open driving route ↗
Port of Tanjung PelepasRoad distance not yet verified
Open driving route ↗
Second Link CheckpointRoad distance not yet verified
Open driving route ↗

Project media & documents.

Source documents.

Explore industrial parks in Johor

Browse the Johor park directory ↗

Your next industrial address

Let’s put your operation on the map.

Leasing, industrial land acquisition and built-to-suit requirements.

Talk to our corporate desk ↗
0 parks in your shortlistCompare parks ↗