industrialpark.my
Pahang / Industrial park profile

Gambang Halal Park

A halal-focused industrial park in Pahang serving food and non-food manufacturing. ECERDC currently identifies the park as HALMAS-listed and promotes industrial lots with supporting infrastructure.

PahangKuantanIndustrial parkHalal manufacturing
ECERDC land-use and utility master plan for Gambang Halal Park in Kuantan, Pahang

Gambang Halal Park · ECERDC published master plan; indicative layout, not a surveyed boundary or completed-facility photograph · Image credit: East Coast Economic Region Development Council (ECERDC) · Image source ↗

About Gambang Halal Park

Gambang Halal Park is in Gambang, Kuantan, Pahang, Malaysia. The ECERDC park serves halal food and non-food manufacturing in the Gambang and Paya Besar area of Kuantan.

Gambang Halal Park and neighbouring Pahang Technology Park are separately named developments, although ECERDC presents them in a combined virtual tour.

ECERDC lists the park’s earthworks and infrastructure among completed projects. This does not establish current vacancy, completion of each factory or a tenant’s own halal certification.

Published industry focus: Halal food and beverages · Pharmaceuticals and nutraceuticals · Cosmetics and personal care · Halal non-food consumer goods · Warehousing and logistics

ECERDC documents describe different industrial-lot, phase and marketed-land scopes. No single current gross park boundary or area is adopted here.

Also known as: GHP · Taman Halal Gambang

Infrastructure & operational fit.

Project-level information provides a starting point. Confirm the actual plot, building and service allocation before making a commitment.

Power provisionECERDC’s 2024 industrial-park poster lists electricity and basic utilities; actual service voltage, available load and commissioning require confirmation for the selected lot.Source statement; actual unit and service confirmation required.
Floor loadingBuilding-specific; no universal park-wide structural floor-loading rating verifiedSource statement; actual unit and service confirmation required.
Gas infrastructureGas pipeline availability, commissioning and individual connection rights not verifiedSource statement; actual unit and service confirmation required.
Fibre & telecomsTelecommunication provision is referenced in project literature; physical fibre routes, carriers and path diversity are not verifiedSource statement; actual unit and service confirmation required.
Highway corridorsEast Coast Expressway corridor
Published park infrastructure does not establish an individual property’s allocated capacity, connection rights, floor rating or current availability. Basic directory profile. Confirm the selected lot or facility’s current availability, commercial terms and commissioned services.

Additional infrastructure records.

PowerECERDC’s 2024 industrial-park poster lists electricity and basic utilities; actual service voltage, available load and commissioning require confirmation for the selected lot.Source stated · 1 November 2026Source ↗
Floor loadingBuilding-specific; no universal park-wide structural floor-loading rating verifiedUnknown · 1 November 2026
GasGas pipeline availability, commissioning and individual connection rights not verifiedUnknown · 1 November 2026
FibreTelecommunication provision is referenced in project literature; physical fibre routes, carriers and path diversity are not verifiedUnknown · 1 November 2026

Connections that matter.

Kuantan PortRoad distance awaiting verificationLogistics reference only; actual phase or facility gate, heavy-vehicle route and current road distance require verification.Measurement source ↗
Open driving route ↗

Project media & documents.

Source documents.

Explore industrial parks in Pahang

Browse the Pahang park directory ↗

Your next industrial address

Let’s put your operation on the map.

Leasing, industrial land acquisition and built-to-suit requirements.

Talk to our corporate desk ↗
0 parks in your shortlistCompare parks ↗