industrialpark.my
Pahang / Industrial precinct profile

Malaysia–China Kuantan Industrial Park 1 & 2

ECERDC identifies MCKIP 1 and 2 as a distinct phase group in Gebeng, near Kuantan Port, targeting advanced manufacturing and industrial processing.

PahangKuantanIndustrial precinctManufacturing phases
ECERDC aerial photograph of industrial facilities pictured for MCKIP 1 and 2 in Gebeng, Kuantan

Industrial facilities pictured on ECERDC’s MCKIP 1 and 2 page · Official photograph, capture date not stated; not a boundary of the phase group · Image credit: East Coast Economic Region Development Council (ECERDC) · Image source ↗

About Malaysia–China Kuantan Industrial Park 1 & 2

Malaysia–China Kuantan Industrial Park 1 & 2 is in Gebeng, Kuantan, Pahang, Malaysia. MCKIP 1 and 2 form a distinct manufacturing phase group within the wider Malaysia–China Kuantan Industrial Park master development.

This profile follows ECERDC’s named MCKIP 1 and 2 phase group. Completion, infrastructure allocation and available premises must be checked for the selected phase and parcel; the MCKIP 3 package milestone is not applied to this phase group.
MCKIP 1 and 2 are the separately identified industrial phase group within the wider MCKIP master development. MCKIP 3 has a separate profile. View Malaysia–China Kuantan Industrial Park ↗

Published industry focus: Steel and related manufacturing · Electrical and electronics · Information and communication technology · Renewable energy components

ECERDC’s phase 1 and 2 webpage states a 685-hectare site. This is a source-specific phase-group scope, not the area of the entire MCKIP master development; confirm current parcel boundaries.

Also known as: MCKIP 1 & 2 · MCKIP 1 and 2 · MCKIP 1 · MCKIP 2 · Taman Perindustrian Malaysia-China Kuantan 1 dan 2

Infrastructure & operational fit.

Project-level information provides a starting point. Confirm the actual plot, building and service allocation before making a commitment.

Power provisionIncoming voltage, available capacity and selected-plot power allocation not verifiedSource statement; actual unit and service confirmation required.
Floor loadingBuilding-specific; no universal park-wide structural floor-load rating verifiedSource statement; actual unit and service confirmation required.
Gas infrastructurePipeline availability and selected-plot connection rights not verifiedSource statement; actual unit and service confirmation required.
Fibre & telecomsFibre routes, carrier availability and route diversity not verified for the selected siteSource statement; actual unit and service confirmation required.
Published park infrastructure does not establish an individual property’s allocated capacity, connection rights, floor rating or current availability. Basic directory profile. Confirm the selected phase, property, permitted use, availability and commissioned services.

Additional infrastructure records.

PowerIncoming voltage, available capacity and selected-plot power allocation not verifiedUnknown · 1 November 2026
Floor loadingBuilding-specific; no universal park-wide structural floor-load rating verifiedUnknown · 1 November 2026
GasPipeline availability and selected-plot connection rights not verifiedUnknown · 1 November 2026
FibreFibre routes, carrier availability and route diversity not verified for the selected siteUnknown · 1 November 2026

Connections that matter.

Kuantan PortRoad distance awaiting verificationConnectivity reference only; selected phase entrance, destination gate and road distance remain unverified.Measurement source ↗
Open driving route ↗

Project media & documents.

Source documents.

Explore industrial parks in Pahang

Browse the Pahang park directory ↗

Your next industrial address

Let’s put your operation on the map.

Leasing, industrial land acquisition and built-to-suit requirements.

Talk to our corporate desk ↗
0 parks in your shortlistCompare parks ↗