industrialpark.my
Pahang / Industrial precinct profile

Malaysia–China Kuantan Industrial Park 3

ECERDC’s MCKIP 3 offering comprises industrial land and supporting infrastructure within the wider Malaysia–China Kuantan master development. Industrial-lot and logistics-project scopes must be checked separately.

PahangKuantanIndustrial precinctIndustrial and logistics phase
ECERDC MCKIP 3 promotional graphic for Gebeng, Kuantan, showing port and airport connectivity references

MCKIP 3 · ECERDC project and connectivity graphic, not a photograph or surveyed plan; rail reference does not confirm operational service · Image credit: East Coast Economic Region Development Council (ECERDC) · Image source ↗

About Malaysia–China Kuantan Industrial Park 3

Malaysia–China Kuantan Industrial Park 3 is in Gebeng, Kuantan, Pahang, Malaysia. MCKIP 3 is separately profiled within the wider MCKIP master development; industrial-lot and logistics-project scopes require separate checks.

ECERDC’s 28 October 2026 release reports completion of MCKIP 3 Phase 1 Package 1 main infrastructure works. This does not confirm completion of all MCKIP 3 phases or every utility connection. Kuantan Port Interchange was handed over on 3 September 2026.
MCKIP 3 is a separately identified phase within the wider MCKIP master development. MCKILP is a named logistics project within MCKIP 3 and is not a synonym for every industrial lot. View Malaysia–China Kuantan Industrial Park ↗

Published industry focus: Metal and non-metal products · Electrical and electronics · Resource-based manufacturing · Renewable energy components · Logistics

ECERDC’s earlier MCKIP 3 industrial flyer identifies 246.5 hectares for its industrial offering. The wider phase includes other components; a single area is not asserted across these different scopes.

Also known as: MCKIP 3 · MCKIP III · Taman Perindustrian Malaysia-China Kuantan 3

Infrastructure & operational fit.

Project-level information provides a starting point. Confirm the actual plot, building and service allocation before making a commitment.

Power provisionECERDC’s MCKIP 3 flyer lists electricity provision for industrial lots; voltage, spare capacity and individual plot allocation require confirmationSource statement; actual unit and service confirmation required.
Floor loadingBuilding-specific; no universal park-wide structural floor-load rating verifiedSource statement; actual unit and service confirmation required.
Gas infrastructureAvailable gas supply is listed for MCKIP 3 industrial lots by ECERDC; pipeline commissioning and individual connection entitlement require confirmationSource statement; actual unit and service confirmation required.
Fibre & telecomsFibre routes, carrier availability and route diversity not verified for the selected siteSource statement; actual unit and service confirmation required.
WaterWater supply and sewage treatment are listed in ECERDC’s MCKIP 3 flyer; confirm service capacity for the selected plotSource statement; actual unit and service confirmation required.
Highway corridorsKuantan Port Interchange · East Coast Expressway / LPT corridor
Published park infrastructure does not establish an individual property’s allocated capacity, connection rights, floor rating or current availability. Basic directory profile. Confirm the selected phase, property, permitted use, availability and commissioned services.

Additional infrastructure records.

PowerECERDC’s MCKIP 3 flyer lists electricity provision for industrial lots; voltage, spare capacity and individual plot allocation require confirmationMCKIP 3Source stated · 1 November 2026Source ↗
Floor loadingBuilding-specific; no universal park-wide structural floor-load rating verifiedMCKIP 3Unknown · 1 November 2026
GasAvailable gas supply is listed for MCKIP 3 industrial lots by ECERDC; pipeline commissioning and individual connection entitlement require confirmationMCKIP 3Source stated · 1 November 2026Source ↗
FibreFibre routes, carrier availability and route diversity not verified for the selected siteMCKIP 3Unknown · 1 November 2026
WaterWater supply and sewage treatment are listed in ECERDC’s MCKIP 3 flyer; confirm service capacity for the selected plotMCKIP 3Source stated · 1 November 2026Source ↗

Connections that matter.

Kuantan Port10 km · Developer-published distance; route basis unspecifiedECERDC MCKIP 3 flyer distances; origin, destination gate and measurement method unspecified. Not verified current road measurements. ECRL station references do not confirm operational rail service.Measurement source ↗
Open driving route ↗
Kuantan Airport40 km · Developer-published distance; route basis unspecifiedECERDC MCKIP 3 flyer distances; origin, destination gate and measurement method unspecified. Not verified current road measurements. ECRL station references do not confirm operational rail service.Measurement source ↗
Open driving route ↗

Project media & documents.

Source documents.

Explore industrial parks in Pahang

Browse the Pahang park directory ↗

Your next industrial address

Let’s put your operation on the map.

Leasing, industrial land acquisition and built-to-suit requirements.

Talk to our corporate desk ↗
0 parks in your shortlistCompare parks ↗