industrialpark.my
Pahang / Industrial park profile

Pekan Automotive Park

An established automotive manufacturing ecosystem in Pekan supporting vehicle assembly, components, accessories, logistics and related engineering activities. Current project literature promotes further industrial investment within the automotive cluster.

PahangPekanIndustrial parkAutomotive manufacturing
ECERDC land-use and utility master plan for Pekan Automotive Park in Pahang

Pekan Automotive Park · ECERDC published master plan; indicative layout, not a surveyed boundary or completed-facility photograph · Image credit: East Coast Economic Region Development Council (ECERDC) · Image source ↗

About Pekan Automotive Park

Pekan Automotive Park is in Pekan, Pahang, Malaysia. The established automotive ecosystem supports vehicle assembly, components, accessories, logistics and engineering activities in Pekan.

ECERDC describes PAP as a mature automotive production ecosystem, and lists its earthworks and infrastructure among completed strategic projects. Individual buildings, products and available plots require separate confirmation.

Published industry focus: Vehicle assembly · Automotive components and accessories · Hybrid and electric vehicles · Commercial vehicles · Automotive R&D and technology

ECERDC’s historical 2014 release referred to 237 acres of land for investment. That figure is not treated as a current gross boundary or current available stock.

Also known as: PAP · Taman Automotif Pekan

Infrastructure & operational fit.

Project-level information provides a starting point. Confirm the actual plot, building and service allocation before making a commitment.

Power provisionECERDC’s published PAP layout identifies TNB and main-substation infrastructure; supply voltage, spare capacity and the selected factory’s allocation are not established.Source statement; actual unit and service confirmation required.
Floor loadingBuilding-specific; no universal park-wide structural floor-loading rating verifiedSource statement; actual unit and service confirmation required.
Gas infrastructureGas pipeline availability, commissioning and individual connection rights not verifiedSource statement; actual unit and service confirmation required.
Fibre & telecomsNo current park-wide fibre-route or carrier-diversity specification verifiedSource statement; actual unit and service confirmation required.
Published park infrastructure does not establish an individual property’s allocated capacity, connection rights, floor rating or current availability. Basic directory profile. Confirm the selected lot or facility’s current availability, commercial terms and commissioned services.

Additional infrastructure records.

PowerECERDC’s published PAP layout identifies TNB and main-substation infrastructure; supply voltage, spare capacity and the selected factory’s allocation are not established.Source stated · 1 November 2026Source ↗
Floor loadingBuilding-specific; no universal park-wide structural floor-loading rating verifiedUnknown · 1 November 2026
GasGas pipeline availability, commissioning and individual connection rights not verifiedUnknown · 1 November 2026
FibreNo current park-wide fibre-route or carrier-diversity specification verifiedUnknown · 1 November 2026

Connections that matter.

Kuantan PortRoad distance awaiting verificationLogistics reference only; actual phase or facility gate, heavy-vehicle route and current road distance require verification.Measurement source ↗
Open driving route ↗

Project media & documents.

Source documents.

Explore industrial parks in Pahang

Browse the Pahang park directory ↗

Your next industrial address

Let’s put your operation on the map.

Leasing, industrial land acquisition and built-to-suit requirements.

Talk to our corporate desk ↗
0 parks in your shortlistCompare parks ↗